2016 ARRL Field Day

FD2016-28

Image 28 of 60

On Saturday morning Glenn and George get back on the SSB tower getting ready for phase 2 ... raising the 40M beam..This was after a very nervous night when we thought parts were missing to the beam... Turns out an assembly error on Friday had caused them to get hidden inside other elements.

Comments are closed.